Case studies

Web platforms and enterprise systems

Calculation and record-keeping systems in place of spreadsheets: a relational schema instead of drifting files, permissions enforced at the API, automated money calculations and reconciliation against a reference.

3 projects in this category · R&D and engineering

Financial modelling

Task: Remove manual work and errors from the Excel model.

Solution: A calculation engine plus automatic reconciliation against the Excel reference.

Result: Metrics: 1:1 match with the reference across 25 report rows and 5 KPIs, 4 methodology errors caught by automated checks, memorandum issued in seconds.

BP Express — investment project calculation platform

Fintech · Financial modelling

BP Express — investment project calculation platform

Context: Investment project calculations instead of Excel: KPIs over 30 years, sensitivity analysis, export to PDF and Excel. Built from scratch on FastAPI + React.

Open project

Web platform and billing

Task: Eliminate data loss in spreadsheets and manual recalculation of payments.

Solution: Relational schema, API-level access control, automatic payout calculation.

Result: Metrics: 5 spreadsheets replaced by one system, manual payout recalculation fully eliminated, monthly reconciliation time down ~85%.

Tutora — tutoring centre management platform

Backend · SaaS · Education

Tutora — tutoring centre management platform

Context: Replacing a set of five Google Sheets with a relational system. Tracking of lessons, students, rates and settlements. Built from scratch: FastAPI and PostgreSQL on the backend, React and TypeScript on the frontend, deployed with Docker.

Open project

Administration panel

Task: Bring the operational loop into a single window.

Solution: A single monitoring and control panel.

Result: Metrics: MTTR down ~39%, report preparation x8.3 faster, SLA breaches down ~31%.

Admin panel: operational control

Software · Operations

Admin panel: operational control

Context: Metrics, requests and process monitoring in one interface for the operations team.

Discuss a project

Describe the task, the data and the timeline. We will propose a format and an outline plan. Reply within one business day, NDA on request.

Discuss a project